When the roof is past repair, we tear off to the deck, fix what’s rotten and put on a roof built for Ohio storms. Most homes take two days.
What’s in the job
- Tear-off to the deck, every old layer, so we can see the wood.
- Rotten decking replaced at the price written in the quote, per sheet.
- Ice-and-water shield along eaves and valleys, synthetic underlayment elsewhere.
- Architectural shingle in the colour you pick from real boards, not a screen.
- Magnet sweep of the yard and driveway, twice.
Jobs like this
Job 036 · New Lisle
Hail storm
- Pitch
- 7/12
- Squares
- 26
- Layers torn off
- 2
- New roof
- Architectural shingle, walnut, new seamless gutters
Golf-ball hail bruised every slope and folded the front gutter. Two old layers came off down to the deck; three sheets of rotted decking were replaced before the new roof went on.
Job 034 · Cutler's Ford
Hail storm
- Pitch
- 5/12
- Squares
- 28
- Layers torn off
- 1
- New roof
- Architectural shingle, charcoal
Hail stripped granules across all four slopes of a low hip roof. One layer off, ice-and-water shield along the eaves, new ridge vent.
Ask for a quote
Three short steps. Add photos if you have them; we’ll take our own at the inspection anyway.